PEACEPLUS - LGBTQIA+ Hub
Contracting Authority
Publication (OJ)
Procedure Type
Buyer headquarters
Sector
Description
**NOTE this is not an above threshold exercise but is a notice to highlight this tender is live on eSourcing NI** The contract is for the provision of LGBTQUIA+ Hub office fit-out to the part ground & first floor of 2 Royal Avenue, Belfast. The rear extension of the building, constructed in the mid 1990s where the fit-out works are located was originally part of a Tesco supermarket. The extension is in turn part of a listed building, No. 2 Royal Avenue, originally the Belfast branch of the Provincial Bank of Ireland was constructed between 1864 and 1869 now operated by Belfast City Council as a community recreational and cultural space for multi-disciplinary uses. The works include, but are not limited to, the following: - โข The demolition / removal of the existing roller shutters, entrance door, lift machinery, screeds, blockwork, suspended ceilings and redundant services. โข Some structural timber floor infills. โข Installation of some new windows to external walls, โข Roof repairs and modification to some roof mounted plant. โข Installation of fit-out works, metal studwork partitions, glazed screens, floor finishes, suspended ceilings and furniture. โข Associated MEP works, including new lift machinery.
CPV Codes
Lots (1)
**NOTE this is not an above threshold exercise but is a notice to highlight this tender is live on eSourcing NI** The contract is for the provision of LGBTQUIA+ Hub office fit-out to the part ground & first floor of 2 Royal Avenue, Belfast. The rear extension of the building, constructed in the mid 1990s where the fit-out works are located was originally part of a Tesco supermarket. The extension is in turn part of a listed building, No. 2 Royal Avenue, originally the Belfast branch of the Provincial Bank of Ireland was constructed between 1864 and 1869 now operated by Belfast City Council as a community recreational and cultural space for multi-disciplinary uses. The works include, but are not limited to, the following: - โข The demolition / removal of the existing roller shutters, entrance door, lift machinery, screeds, blockwork, suspended ceilings and redundant services. โข Some structural timber floor infills. โข Installation of some new windows to external walls, โข Roof repairs and modification to some roof mounted plant. โข Installation of fit-out works, metal studwork partitions, glazed screens, floor finishes, suspended ceilings and furniture. โข Associated MEP works, including new lift machinery.